Hairyloon
Joined: 20 Nov 2008 Posts: 15425 Location: Today I are mostly being in Yorkshire.
|
|
|
|
|
vegplot
Joined: 19 Apr 2007 Posts: 21301 Location: Bethesda, Gwynedd
|
|
|
|
|
Gervase
Joined: 17 Nov 2004 Posts: 8655
|
|
|
|
|
henchard
Joined: 23 Aug 2012 Posts: 232 Location: Carmarthenshire
|
|
|
|
|
Dee J
Joined: 22 May 2005 Posts: 342 Location: West Devon
|
|
|
|
|
Nick
Joined: 02 Nov 2004 Posts: 34535 Location: Hereford
|
|
|
|
|
Hairyloon
Joined: 20 Nov 2008 Posts: 15425 Location: Today I are mostly being in Yorkshire.
|
|
|
|
|
dpack
Joined: 02 Jul 2005 Posts: 45472 Location: yes
|
Posted: Mon Feb 09, 15 12:22 pm Post subject: |
|
pretty much what they said re do it properly ,building control/ part p sign off
or get a part p spark to quote for all the work or to quote for just the electrical bit (ie you cut chases ,drill holes,plaster,re decorate etc as required
ps not all sparks will sign off on the basis of a meter based test cos there could be a dangeroos mistake that wont show on a meter or be visible to mk one eyeball(route of wire,kinks,dangles,lack of metal cladding armour in places at risk of holes being made etc etc etc)
to do the job then ask a spark to sign it off will be tricky,if you diy ask a spark first what they will sign off and what they insist on seeing/doing as the job is done .
pps for a single item like a lit mirror two visits would probably cost as much as one visit to do the whole job ,for a full house rewire doing the chasing/holes etc as diy can save a lot of cash if the spark is ok with that.
ppps i have seen some dreadful work done by "professional"sparks so the usual avoid cowboys advice applies |
|
|
|
|
Hairyloon
Joined: 20 Nov 2008 Posts: 15425 Location: Today I are mostly being in Yorkshire.
|
|
|
|
|
dpack
Joined: 02 Jul 2005 Posts: 45472 Location: yes
|
|
|
|
|
|